Skip to content
  • There are no suggestions because the search field is empty.

How to install NX25 Series Rotor Group Kit

Install NX25 Series Rotor Group Kit in 6 steps.

 

WARNING: Relieve pump pressure and disconnect power before starting

Directions to Install Rotor and Vane Placement Kit

Disassembly of Rotor and Shaft Seal

  1. Remove rotor cover, gasket, rotor, vanes, and rotor key

Replacing Rotor, Rotor Key, Vanes, and Cover Gasket

  1. Slide the rotor onto the motor shaft
  2. Align rotor with shaft and insert rotor key
  3. Install vanes all facing same direction
  4. Place gasket in indentation, ensure it is properly seated
  5. Install new rotor cover

Contact

Sales & Support:
💬 8AM – 5PM CST (M-F)
(800)-247-1854
Contact Us Form

Iowa Location
📍 1017 Pearl Street, Floyd, IA 50435

Tennessee Location
📍 5558 Federal Ave, Memphis, TN 38118

Services

Explore

FarmChem Logo
SSL Secure Website Accepted Credit Cards

Copyright © 1974 – 2025 FarmChem® | All Rights Reserved