Install FR900 Mechanical Meter Full Rebuild Kit in 31 steps.
Directions to Install FR900 Mechanical Meter Full Rebuild Kit
Disassembling Meter
- Slide off reset knob
- Remove (2) fasteners and bracket from front of meter
- Remove (2) fasteners and faceplate
- Remove (2) fasteners and remove register
- Flip meter over, remove (8) fasteners from meter housing
- Remove gasket
- Remove (4) fastener and chamber assembly
- Remove (2) fasteners and gear frame
- Remove cluster gear assembly
- Remove drive gear assembly
- Remove driver pinion assembly
Assembling Gears
- Install the pinion washer, driver, and secure with retaining ring
- Place drive gear o-ring in indentation
- Place washer on long side of drive gear shaft
- Install drive gear into meter
- Install pinion bevel on other side of drive shaft to secure in place
- Place washer onto drive shaft
- Install cluster gear shaft into meter
- Install cluster gear and washer onto shaft
- Place new gasket onto meter cover
Installing Gear Frame and Chamber Assembly
- Install new gear frame and secure with (2) fasteners
- Install new chamber assembly with opening facing meter inlet
- Secure in place with (4) fasteners
Reassembly of the Meter
- Place meter housing onto meter cover
- Secure (8) fasteners, tighten to at least 100 in-lb
- Flip meter housing and cover over
- Align register mounting tabs with holes on meter cover, secure with (2) fasteners
- Place faceplate onto register, secure with (2) fasteners
- Slide reset knob back onto reset shaft
Replacing Flange Gaskets
- Remove flanges, discard old gaskets
- Place new gaskets in indentations, reinstall flanges